BHP WAIO Power Distribution Panel
Completed scope included the supply and installation of a new power distribution panel at Mining Area C.
CBH Electrical Refurbishment
Full electrical refurbishment of a storage facility located in Coorow, WA. The scope included the installation of a new switch room along with all associated apparatus throughout the facility.
Fortescue Christmas Creek Obsolete Switchgear
Upgrade of End-of-Life switchgear throughout substations across Christmas Creek. Boodjara were tasked with completing tie in’s during the shutdown periods.
BHP Nickel West Substation Upgrades
Upgrade of electrical infrastructure throughout switch rooms at the Nickel West Leinster operation.
BHP WAIO Slope Monitoring Devices
Boodjara completed the electrical scope required for the installation of new slope monitoring devices across Mining Area C and South Flank operations.
BHP WAIO Fibre Optics Installation
Installation of a new Fibre Optic cable for a TLO facility at BHP’s Yandi Mine.
South 32 HV Maintenance
Boodjara HV Technicians are completing HV Mainitennace at the Worsley Alumina Facility in the South-West of Western Australia.